Safety Bay Road Principal Shared Path
This shared path development stretches over 800m along Safety Bay Road, between Nairn Drive and Eighty Road.
The project is the second stage of a multi-stage local government infrastructure upgrade currently being undertaken by the City of Rockingham.
Designed to improve the pedestrian and cyclist access between Baldivis and Wanbro, the project, consists of:
- 3000m2 of red asphalt pavement;
- 900m of flush edge beam;
- 90m of 3 course limestone retaining wall; and the upgrade of two PTA bus stops.
The Dowsing Group successfully completed the project with zero environmental or safety incidents.





