Safety Bay Road Principal Shared Path

This shared path development stretches over 800m along Safety Bay Road, between Nairn Drive and Eighty Road.

The project is the second stage of a multi-stage local government infrastructure upgrade currently being undertaken by the City of Rockingham.

Designed to improve the pedestrian and cyclist access between Baldivis and Wanbro, the project, consists of:

  • 3000m2 of red asphalt pavement;
  • 900m of flush edge beam;
  • 90m of 3 course limestone retaining wall; and the upgrade of two PTA bus stops.

The Dowsing Group successfully completed the project with zero environmental or safety incidents.